Duke Hall Before

Going on at Duke Hall

on Friday, 13 September 2013. Posted in Duke Hall

  • The light pole is down
  • Electrical has passed on the second floor
  • More painting
  • The ceilings in the bathroom started this week
  • Final clean started this week on the third floor
  • HVAC is compete in the crawl space
  • Sealing the crawl space starts Monday
  • Trim outs on the HVAC
  • Trim outs on Electrical
  • Trim outs on Plumbing